Table AT7. Event summary of DVTPP Deployment 4, Hole U1324B, 362.4 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0615 Start lowering DVTPP downhole
2 0636 Stop at mudline for 5 min
3 0641 Start lowering probe
4
Raise BHA off BOH
5 0657 CDS lands in BHA
6 0701 Lower bit, start penetration of DVTPP into formation
7 0704 End of penetration, bit on BOH
8
Raise BHA off BOH
9 0751 Pull probe out of formation and uphole with wireline
10 0827 Stop at mudline for 5 min
11 0832 Pull DVTPP uphole slowly with wireline

Notes: Measurements taken 23 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.