Previous   |    Close   |    Next

Table AT6. Event summary of DVTPP Deployment 3, Hole U1324B, 229.1 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0946 Start lowering DVTPP downhole
2 1009 Stop at mudline for 2 min
3 1011 Start lowering probe
4
Raise BHA off BOH
5
CDS lands in BHA
6 1024 Lower bit, start penetration of DVTPP into formation
7 1028 End of penetration, bit on BOH
8
Raise BHA off BOH
9 1118 Pull probe out of formation and uphole with wireline
10 1230 Stop at mudline for 2 min
11 1232 Pull DVTPP uphole with wireline

Notes: Measurements taken 22 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.

Previous   |    Close   |    Next   |    Top of page