Table AT5. Event summary of DVTPP Deployment 2, Hole U1320A, 289.9 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1900 | Start lowering DVTPP downhole |
2 | 1911 | Stop at mudline for 5 min |
3 | 1917 | Start lowering probe |
4 | 1917 | Raise BHA 16 m off BOH |
5 | 1922 | CDS lands in BHA |
6 | 1923 | Lower bit, start penetration of DVTPP into formation |
7 | 1926 | End of penetration, bit on BOH |
8 | 1928 | Raise BHA 6 m off BOH |
9 | 1939 | Pull probe out of formation and uphole with wireline |
10 | 1942 | Stop at mudline for 5 min |
11 | 1948 | Pull DVTPP uphole with wireline |
Notes: Measurements taken 9 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.