Table AT4. Event summary of DVTPP Deployment 1, Hole U1320A, 203.4 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 0850 Start lowering DVTPP downhole
2 0901 Stop at mudline for 10 min
3 0912 Start lowering probe
4 0912 Raise BHA 11 m off BOH
5 0916 CDS lands in BHA
6 0927 Lower bit, start penetration of DVTPP into formation
7 0931 End of penetration, bit on BOH
8 0933 Raise BHA 4 m off BOH
9 1013 Pull probe out of formation and uphole with wireline

Notes: Measurements taken 9 June 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.