Table AT3. Event summary of DVTPP Deployment 20, Hole U1322D, 175 mbsf. (See table notes.)
Event number |
Time (GMT) |
Event description |
---|---|---|
1 | 1837 | Start lowering DVTPP downhole |
2 | 1859 | Stop at mudline for 5 min |
3 | 1900 | Start lowering probe |
4 | 1904 | Move BHA to 7 m off BOH |
5 | 1913 | CDS lands in BHA |
6 | 1920 | Lower bit, start penetration of DVTPP into formation |
7 | 1921 | End of penetration, bit on BOH |
8 | 1921 | Raise BHA 2.4 m off BOH |
9 | 2022 | Pull probe out of formation and uphole with wireline |
10 | 2026 | Stop at mudline for 5 min |
11 | 2031 | Pull DVTPP uphole with wireline |
Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.
Previous | Close | Next | Top of page