Table AT3. Event summary of DVTPP Deployment 20, Hole U1322D, 175 mbsf. (See table notes.)

Event
number
Time
(GMT)
Event
description
1 1837 Start lowering DVTPP downhole
2 1859 Stop at mudline for 5 min
3 1900 Start lowering probe
4 1904 Move BHA to 7 m off BOH
5 1913 CDS lands in BHA
6 1920 Lower bit, start penetration of DVTPP into formation
7 1921 End of penetration, bit on BOH
8 1921 Raise BHA 2.4 m off BOH
9 2022 Pull probe out of formation and uphole with wireline
10 2026 Stop at mudline for 5 min
11 2031 Pull DVTPP uphole with wireline

Notes: Measurements taken 2 July 2005. GMT = Greenwich Mean Time, DVTPP = Davis-Villinger Temperature-Pressure Probe, BHA = bottom-hole assembly, BOH = bottom of hole, CDS = colleted delivery system.