Previous   |   Close   |   Next

Figure F35. Combined infrared (IR) images of core liner temperature from Holes U1325B and U1325C compared to logging-while-drilling/measurement-while-drilling (LWD/MWD) resistivity and calculated pore water saturation from Hole U1325A. Core recovery and handling time are also shown. BSR = bottom-simulating reflector. (This figure is also available in an oversized format.)

Previous   |   Close   |   Next  |   Top of page