Previous   |    Close   |    Next

Figure F7. Schematic of Hole U1362A seafloor installation after completion of subseafloor drilling, coring, and casing operations but prior to installation of a long-term subseafloor borehole observatory (CORK). The Hole U1362A CORK is illustrated schematically in Figure F13.

Previous   |    Close   |    Next   |    Top of page