Figure F8. Schematic of Hole U1362B seafloor installation after completion of subseafloor drilling and casing operations but prior to installation of a long-term subseafloor borehole observatory (CORK). The Hole U1362B CORK is illustrated schematically in Figure F13.
Previous | Close | Next | Top of page