Previous   |    Close   |    Next

Figure F9. Calculated tides at the Expedition 327 drill sites. A. Tides for duration of expedition. B. Tides for a two-day period, including period when >100% of a hard rock core was recovered. When the ship moved downward during a falling tide, penetration sometimes exceeded the relative motion of the bit with respect to the rig floor.

Previous   |    Close   |    Next   |    Top of page