IODP

doi:10.2204/iodp.sp.321T.2009

Site summaries (continued)

Hole U1301B
Priority:
Primary
Position:
47°45.228’N, 127°45.827’W
Water depth (mbrf)
2667.8
Target drilling depth (mbsf):
Not applicable; reoccupy existing
borehole location; no new penetration
Approved maximum penetration (mbsf):
Not applicable; reoccupy existing
borehole location; no new penetration
Survey coverage (track map, seismic profile); sediment cores:
See Fisher et al. (2005a) and Zühlsdorff
et al. (2005).
Objective (see text for complete details):
Observatory is not completely sealed.
Seal subseafloor borehole observatory by pumping cement into the observatory’s reentry cone.
Drilling/coring program:
Lower end of drill string to ROV platform on reentry cone; deploy cement through sector cut out of surface mesh of ROV platform (Fig. F3B)
Anticipated lithology:
Not applicable; reoccupy existing
borehole location; no new penetration