IODP

Next Section | Table of Contents

doi:10.2204/iodp.sp.nantroseize1.2006

Figure F7. Locations of proposed Sites NT2-01, NT2-03, and NT3-01 on interpreted CDEX seismic Line L (see Fig. F2 for location). The Stage 1 borehole penetration depths are shown in white for Sites NT2-03 and NT3-01; drilling to greater depths (red) will be completed by riser drilling in subsequent stages of the NanTroSEIZE project. Site NT2-02 has been deferred to a later stage. The locations of Sites NT2-01 and NT2-03 may shift once the newly acquired 3-D seismic data are interpreted in coming months. Location of Line L is shown in Figures F1A and F2. Vertical exaggeration = ~1.5X. CMP = common midpoint.