Table AT31. Event summary of T2P Deployment 9, Hole U1324B, 368.0 mbsf. (See table notes.)
| Event number |
Time (GMT) |
Event description |
|---|---|---|
| 1 | 1328 | Start data logger at 1 Hz |
| 2 | 1457 | T2P on rig floor |
| 3 | 1511 | Start lowering T2P downhole, pumps on |
| 4 | 1528 | Stop at 1058 mbsl, pumps off |
| 5 | 1533 | Start lowering probe |
| 6 | 1545 | Stop at 1432 mbsl, pumps off |
| 7 | 1549 | Start lowering probe |
| 8 | 1553 | CDS lands in BHA, pumps off |
| 9 | 1554 | Start penetration of T2P into sediment |
| 10 | 1558 | End of T2P penetration, bit at BOH |
| 11 | 1559 | Raise BHA 2 m off BOH |
| 12 | 1640 | Pull T2P uphole slowly with wireline |
| 13 | 1648 | Stop at 1058 mbsl, pumps off |
| 14 | 1651 | Pull T2P uphole slowly with wireline |
| 15 | 1701 | Disconnect wireline from CDS |
| 16 | 1704 | Disconnect CDS from spacer |
| 17 | 1706 | Disconnect spacer from CDS |
| 18 | 1708 | T2P out of pipe |
| 19 | 1730 | Download data from data logger |
Notes: Measurements taken 23 June 2005. GMT = Greenwich Mean Time, T2P = temperature/dual pressure probe, CDS = colleted delivery system, BHA = bottom-hole assembly, BOH = bottom of hole.