Table AT32. Event summary of T2P Deployment 11, Hole U1324B, 593.2 mbsf. (See table notes.)
| Event number |
Time (GMT) |
Event description |
|---|---|---|
| 1 | 1802 | Start data logger at 1 Hz |
| 2 | 1818 | T2P on rig floor |
| 3 | 1831 | Start lowering T2P downhole, pumps on |
| 4 | 1842 | Stop at 1068 mbsl, pumps off |
| 5 | 1845 | Start lowering probe |
| 6 | 1850 | Stop at 1510 mbsl, pumps off |
| 7 | 1856 | Start lowering probe |
| 8 | 1858 | CDS lands in BHA, pumps off |
| 9 | 1914 | Pull T2P uphole slowly with wireline |
| 10 | 1925 | Stop at 1067 mbsl, pumps off |
| 11 | 1928 | Pull T2P uphole slowly with wireline |
| 12 | 1934 | Disconnect wireline from CDS |
| 13 | 1938 | Disconnect CDS from spacer |
| 14 | 1940 | Disconnect spacer from CDS |
| 15 | 1946 | T2P out of pipe |
| 16 | 2010 | Download data from data logger |