Priority:
|
Alternate for CB-04B
|
Position:
|
44°57.8052´S, 172°03.6799´E
|
Water depth (m):
|
713
|
Target drilling depth (mbsf):
|
1500
|
Approved maximum penetration (mbsf):
|
Pending approval
|
Survey coverage:
|
EW00-01-60 (CDP 1338), no crossing line
• Track map (Fig AF1)
• Seismic profile (Fig AF11)
• Location map (Fig. F3)
|
Objective (see text for details):
|
Sample slope facies of progradational sequence boundaries, particularly Unconformities U6–U9, U11, and U13–16 (Late Miocene to early Pliocene)
Sample Marshall Paraconformity (Oligocene) and top of Amuri Limestone (late Eocene)
|
Drilling, coring, and downhole measurement program:
|
Hole A:
• APC/XCB to refusal (APC core orientation)
• Wireline log (triple combo, FMS-sonic)
• VSP with VSI
Hole B:
• Drill without coring to APC refusal depths
• RCB coring to 1500 mbsf
• wireline log (triple combo, FMS-sonic)
• VSP with VSI
|
Anticipated lithology:
|
0–1282 mbsf: Terrigenous siltstone and silty mudstone with intervals of fine-grained sand and mud
1282 mbsf (or slightly shallower)–1500 mbsf: Limestone
|