Expedition 332 drilling and observatory installation plan

Contingency operations for Expedition 332 are based on the current state of knowledge at the time of writing this Scientific Prospectus. These plans may be modified both before and during Expedition 332 based on continuing PMT discussions. The Expedition 332 drilling schedule is shown in Figure F5A and F5B. The following operations are planned:

  1. Install riserless CORK observatory at Site C0002.

  2. Replace SmartPlug at Site C0010 with its improved version (GENIUSPlug).