Schedule for Expedition 334
Expedition 334 is based on part of Integrated Ocean Drilling Program (IODP) drilling proposal number 537A-Full5 (available at iodp.tamu.edu/scienceops/precruise/
costarica/CRISP_summary.html). Following ranking by the IODP Scientific Advisory Structure, the expedition was scheduled for the research vessel R/V JOIDES Resolution, operating under contract with the U.S. Implementing Organization (USIO). At the time of publication of this Scientific Prospectus, the expedition is scheduled to start in Puntarenas, Costa Rica, on 15 March 2011 and to end in Balboa, Panama, on 14 April 2011. A total of 25 days will be available for the drilling, coring, and downhole measurements described in this report (for the current detailed schedule, see iodp.tamu.edu/scienceops/). Further details about the facilities aboard the JOIDES Resolution and the USIO can be found at www.iodp-usio.org/.