-
- Contents
- Title page
- Publisher’s notes
- Introduction
- Operations plan/Drilling strategy
- References
-
Tables
-
Figures
-
Site summaries
-
Appendix figures
- AF1. Bathymetry, Sites GC-01A and GC-09A.
- AF2. Line FADO L-38, Site GC-01A.
- AF3. Line P74-45, Site GC-09A.
- AF4. Bathymetry, Sites GC-04C, GC-04D, GC-10B, and GC-10C.
- AF5. Line S81A-16, Sites GC-04C and GC-04D.
- AF6. Bathymetry, Site GC-02B.
- AF7. Line Tasyo L-8, Site GC-02B.
- AF8. Bathymetry, Site GC-11A.
- AF9. Line HE91-20, Site GC-11A.
- AF10. Bathymetry, Site WI-01B.
- AF11. Line PD00-522, Site WI-01B.
- AF12. Lines Steam-9407 and BS-09, Site SHACK-04A.
- AF13. Line BS09, Site SHACK-04A.
- AF14. Line Steam-9407, Site SHACK-04A.
- AF15. Line CADIZ-21, Sites GC-10B and GC-10C.
- PDF file
- See Expedition 339 Scientific Prospectus (September 2011)
|
|
|
Previous |
Next
doi:10.2204/iodp.sp.339add.2011
Site summaries (continued)
APL Site SHACK-04A
Priority: |
Primary site |
Position: |
Lat 37°34.29′N (37.571475), Long 10°7.57′W (–10.12616) (WGS 84) |
Water depth (m) |
2578 |
Target depth (mbsf): |
150 |
Approved maximum penetration (mbsf): |
150 |
Previous drilling in area: |
None |
Comments: |
Jurisdiction: Portugal
Potential hazards: shallow gas, shallow-water flow, soft seabed, strong currents |
Survey coverage
(track map, seismic profile) |
• Track lines for seismic Lines Steam-9407 and BS-09 indicating position of proposed Site SHACK-04A (Fig. AF12).
• Seismic Line BS09 indicating the position of proposed Site SHACK-04A at shotpoint 3950 (Fig. AF13)
• Seismic Line Steam-9407 showing the position of proposed Site SHACK-04A and depth of penetration (~150 mbsf) (Fig. AF14)
|
Objectives
(see text for complete details): |
• Recover millennial-scale marine reference section for the Pleistocene
• Provide marine sediment analog to the polar ice cores
• Reconstruct deep water circulation changes (i.e., mixing ratio of southern and northern component water)
• Facilitate marine-terrestrial correlations
• Construct an integrated stratigraphy
|
Drilling/coring program: |
Quadruple APC to refusal, drillover
Temperature measurements: APCT-3 |
Downhole logging program: |
None |
Anticipated lithology: |
Hemipelagic muds |
Top of page |
Previous |
Next
|