IODP publications Expeditions Apply to sail Sample requests Site survey data Search | |||
doi:10.2204/iodp.sp.340T.2011 Schedule for Expedition 340TIntegrated Ocean Drilling Program (IODP) Expedition 340T is based on IODP drilling proposal number 779-APL (available at iodp.tamu.edu/scienceops/expeditions/atlantis_massif.html). Following ranking by the IODP Scientific Advisory Structure, the expedition was scheduled for the research vessel JOIDES Resolution, operating under contract with the US Implementing Organization (USIO). At the time of publication of this Scientific Prospectus, the expedition is scheduled to start in Lisbon, Portugal, on 17 January 2012 and to end in St. John’s, Antigua, on 6 February 2012. A total of 3 days is scheduled for downhole logging operations on site, with 12 days of transit to and from the site, as described in this prospectus (for the current detailed schedule, see iodp.tamu.edu/scienceops/). Further details about the facilities aboard the JOIDES Resolution and the USIO can be found at www.iodp-usio.org/. |