IODP

doi:10.14379/iodp.sp.352.2013

Site summaries (continued)

Site 459

Priority: Alternate
Position: 17°51.75′N, 147°18.09′E
Water depth (m): 4130
Target drilling depth (mbsf): 1500 (500 m sediment, 1000 m basement)
Approved maximum penetration (mbsf): 1500 (pending EPSP approval to deepen)
Survey coverage: MGL1204 Line N CDP 17806
• Track map (Fig. AF1B)
• Seismic profile (Fig. AF10), Mrozowski et al. (1982), and Chapp et al. (2008)
Objective: Characterize transitional basalt lavas and associated intrusive rocks to investigate subduction initiation processes and test supra-subduction zone ophiolite models
Drilling, coring, and downhole measurements program: • Hole A: jet-in test
• Hole B: reentry system (16 and 10-3/4 inch casing to 500 mbsf)
• Hole B: drill without recovery to 650 mbsf, RCB from 650 to 1500 mbsf
• Wireline logging (triple combo, FMS-sonic)
Nature of rock anticipated: Pelagic carbonate with thin ash layers, turbidites, boninite, basaltic lavas, and diabase