IODP

doi:10.14379/iodp.sp.360.2015

Site summaries

Site AtBk6

Priority: 1
Position: 32°42.3402’S; 57°16.6910’E North-central part of Atlantis Bank wave-cut platform
Water depth (m): 695
Target drilling depth (mbsf): As deep as possible (>3 km)
Approved maximum penetration (mbsf): To be agreed; but >3 km
Survey coverage (track map, seismic profile): Seabed drill core Site JR31-BR-8
Objective(s): Drill deep section through gabbro to crust–mantle transition
Drilling program: Re-entry system: Plan A: 15-m long 13.375-inch drill-in casing Plan B conventional 15-m long 16-inch casing. RCB core to 220 mbsf; set 200-m long 10.75 inch casing (after logging). RCB core as deep as time permits. Log.
Logging/downhole measurements program: Three runs with triple combo, FMS-sonic, and UBI before setting 200 m long 10.75 inch casing; same three runs plus VSI from 200 mbsf to maximum depth achieved.
Nature of rock anticipated: Gabbro, possible rare diabase; ultimately serpentinized
and thence fresh peridotite

Site AtBk4

Priority: 2 (weather contingency)
Position: 32°44.6643’S; 57°17.0384’E Southern end of Atlantis Bank wave-cut platform
Water depth (m): 839
Target drilling depth (mbsf): ~150 (single bit)
Approved maximum penetration (mbsf): To be agreed
Survey coverage (track map; seismic profile): Seabed drill core Site JR31-BGS-12
Objective(s): Drill short section of serpentinized peridotite
Drilling program: Single-bit bare-rock spud-in
Logging/downhole measurements program: None
Nature of rock anticipated: Serpentinized peridotite