Contingency plans

Contingency operational options

The details of possible operational priorities or contingencies will be determined by the Co-Chief Scientists, EPMs, Chief Project Scientists, PMT, and Operation Superintendents; however, current preliminary discussion includes (Fig. F8)

  • Coring Hole C0002F beyond 3600 mbsf,

  • Logging at Site C0012 (input site) with LWD, and

  • Logging at Site C0007 (frontal thrust site) with LWD.