Priority:
|
Primary
|
Position:
|
16°43.13′N 62°5.05′W
|
Water depth (m below sea level):
|
940
|
Target drilling depth (m below seafloor):
|
250
|
Approved maximum penetration (mbsf):
|
275
|
Survey coverage (track map; seismic profile):
|
Line 52 (cdp 2994) Caraval Cruise 2002 and Line 41 (cdp 1430) Gwadaseis Cruise 2009
• Track map (Fig. AF2)
• Seismic profile (Fig. AF2)
• Location map (Fig. F1)
|
Objective(s):
|
Characterization of debris avalanche emplacement, of associated erosional processes and of tephra diagenisis
|
Drilling program:
|
• Hole A: APC/XCB to TD with orientation and APCT3
• Hole B: APC/XCB to TD
|
Logging program:
|
Triple Combo and FMS Sonic
|
Anticipated material:
|
Volcanic and biogenic sediments with intercalated tephra layers and chaotic debris avalanche deposists (breccias)
|
Estimated operation time (days):
|
3.1
|