Priority:
|
Primary
|
Position:
|
16°29.60′N 61°57.09′W
|
Water depth (m below sea level):
|
1200
|
Target drilling depth (m below seafloor):
|
244
|
Approved maximum penetration (mbsf):
|
270
|
Survey coverage (track map; seismic profile):
|
Line 52 (cdp 740) Caraval Cruise 2002 and Line 45 (cdp 385) JC 45/46 Cruise 2010
• Track map (Fig. AF4)
• Seismic profile (Fig. AF4)
• Location map (Fig. F1)
|
Objective(s):
|
Characterization of sedimentation processes (e.g. determining the association with debris avalanche emplacement)
|
Drilling program:
|
• Hole A: APC/XCB to TD with orientation and APCT3
• Hole B: APC/XCB to TD
|
Logging program:
|
Triple Combo and FMS Sonic
|
Anticipated material:
|
Volcanic and biogenic sediments with intercalated tephra layers and chaotic debris avalanche deposists (breccias), maybe turbidites
|
Estimated operation time (days):
|
3
|