Priority:
|
Primary
|
Position:
|
4.766388°N, 73.135556°E
|
Jurisdiction:
|
Maldives
|
Water depth (m):
|
419
|
Target drilling depth (mbsf):
|
642
|
Approved maximum penetration (mbsf):
|
710
|
Survey coverage (track map; seismic profile):
|
Location map (Fig. F13)
Primary line(s): 124-channel seismic Line 62 (Fig. F14)
124-channel seismic Line 59
|
Objective(s):
|
1. Analyze cyclostratigraphy of drift deposits, providing reconstructions of changes in the current regime and monsoon cyclicity
2. Constrain the timing of unconformities and sedimentary interruptions |
Drilling program:
|
Triple APC to 200 mbsf
APCT-3 measurements and orientation on all holes
Hole C: XCB to ~642 mbsf |
Logging and downhole measurement program:
|
Wireline log with triple combo, FMS-sonic, and VSI.
|
Nature of rock anticipated:
|
Calcareous ooze, chalk
|