Priority:
|
Primary
|
Position:
|
4.929444°N, 73.286776°E
|
Jurisdiction:
|
Maldives
|
Water depth (m):
|
533
|
Target drilling depth (mbsf):
|
554
|
Approved maximum penetration (mbsf):
|
590
|
Survey coverage (track map; seismic profile):
|
ODP Site 716
Location map (Fig. F17)
Primary line(s): Line 65 (Fig. F18)
|
Objective(s):
|
1. Analyze cyclostratigraphy of drift deposits, providing reconstructions of changes in the current regime and monsoon cyclicity
2. Constrain the timing of unconformities and sedimentary interruptions |
Drilling program:
|
Hole A: drill/wash to 170 mbsf, APC/XCB to 554 mbsf
|
Logging and downhole measurement program:
|
Wireline log with triple combo, FMS-sonic, and VSI
|
Nature of rock anticipated:
|
Calcareous ooze, chalk
|