Priority:
|
Primary
|
Position:
|
4.766388°N, 72.983889°E
|
Jurisdiction:
|
Maldives
|
Water depth (m):
|
380
|
Target drilling depth (mbsf):
|
420
|
Approved maximum penetration (mbsf):
|
420
|
Survey coverage (track map; seismic profile):
|
Location map (Fig. F13)
Primary line(s): Line 62 (Fig. F16)
|
Objective(s):
|
1. Provide detailed reconstruction of the predrowning, drowning, and postdrowning evolution of the carbonate bank by linking the seismic stratigraphic record to the sedimentary record
2. Constrain the timing of this evolution, allowing age assignments of unconformities, sedimentary interruptions, sedimentary turnovers, and onset of drift deposition
3. Reconstruct and date bank to drift turnover |
Drilling program:
|
Single APC/XCB to ~170 mbsf (based on seismic).
Hole A: orientation and APCT-3 measurements
Hole B: drill to ~170 with RCB and center bit and with RCB to 420 mbsf |
Logging and downhole measurement program:
|
Wireline log with triple combo and FMS-sonic
|
Nature of rock anticipated:
|
Calcareous ooze, chalk, limestone
|