IODP

doi:10.2204/iodp.sp.324.2009

Site summaries (continued)

Proposed Site SRCH-5

Priority:
Primary site
Position:
36°06.944’N, 158°27.526’E
Water depth
(m):
3148
Target drilling
depth (mbsf):
384 (184 m sediment, 200 m basement)
Requested
maximum
penetration
(mbsf):
~484 (300 m basement)
Survey
coverage:
Cruise TN037, R/V Thomas Thompson
• Seismic Line 8 (time: 0005Z, 15 Aug 1994) (Fig. AF6)
• Track map (Figs. AF3, AF4)
Objective:
(see text
for details)
• Core igneous basement from Central High summit for petrographic, geochemical, isotopic, radiometric dating, and paleolatitude investigation.
• Determine the origin and emplacement history of Shatsky Rise basement rocks.
Drilling,
coring, and
downhole
measurement
program:
Hole A
• RCB wash to ~50 m above basement, core to TD (possibly two bits needed and FFF deployment?)
• Wireline log (triple combo, FMS-Sonic)
Anticipated
lithology:
• 0-54 mbsf: pelagic ooze
• 54–184 mbsf: chalk with chert
• >184 mbsf: basalt