IODP

doi:10.2204/iodp.sp.324.2009

Site summaries (continued)

Proposed Site SRSH-7

Priority:
Alternate site
Position:
34°44.269’N, 159°22.620’E
Water depth
(m):
4196
Target drilling
depth (mbsf):
330 (230 m sediment, 100 m basement)
Requested
maximum
penetration
(mbsf):
~530 (300 m basement)
Survey
coverage:
Cruise TN037, R/V Thomas Thompson
• Seismic Line 13 (time: 2350Z, 21 Aug 1994) (Fig. AF27)
• Track map (Figs. AF25)
Objective:
(see text
for details)
• Core igneous basement from the late stage of Southern High for petrographic, geochemical, isotopic, radiometric dating, and paleolatitude investigation.
• Determine the origin and emplacement history of Shatsky Rise basement rocks.
Drilling,
coring, and
downhole
measurement
program:
Hole A
• RCB wash to ~50 m above basement, core to TD or bit failure
• Wireline log (triple combo, FMS-Sonic)
Anticipated
lithology:
• 0–41 mbsf: pelagic ooze
• 41–230 mbsf: chalk with chert and limestone
• >230 mbsf: basalt