IODP

doi:10.2204/iodp.sp.324.2009

Site summaries (continued)

Proposed Site SRSH-2B

Priority:
Alternate site
Position:
30°54.357’N, 156°32.473’E
Water depth
(m):
4783
Target drilling
depth (mbsf):
611 (511 m sediment, 100 m basement)
Requested
maximum
penetration
(mbsf):
~811 (300 m basement)
Survey
coverage:
Cruise TN037, R/V Thomas Thompson
• Seismic Line 17C (time: 2301Z, 28 Aug 1994) (Fig. AF15)
• Track map (Figs. AF13, AF14)
Objective:
(see text
for details)
• Core possible late stage sills and igneous basement rocks from the deep flank of Southern High for petrographic, geochemical, isotopic, radiometric dating, and paleolatitude investigation.
• Determine the origin and emplacement history of early Shatsky Rise basement rocks.
Drilling,
coring, and
downhole
measurement
program:
Hole A
• RCB wash to ~50 m above sediment reflectors (sill or postshield lava flow?), core to TD or bit failure
• Wireline log (triple combo, FMS-Sonic)
Anticipated
lithology:
• 0–74 mbsf: pelagic ooze
• 74–511 mbsf: chert/chalk/limestone and possible sill?
• >511 mbsf: basalt