IODP

doi:10.2204/iodp.sp.324.2009

Site summaries (continued)

Proposed Site SRNH-2

Priority:
Primary site
Position:
38°04.400’N, 162°38.710’E
Water depth
(m):
3654
Target drilling
depth (mbsf):
294 (194 m sediment, 100 m basement)
Requested
maximum
penetration
(mbsf):
~494 (300 m basement)
Survey
coverage:
Cruise TN037, R/V Thomas Thompson
• Seismic Line 5A (time: 2130, 09 Aug 1994) (Fig. AF11)
• Track map (Fig. AF9)
Objective:
(see text
for details)
• Core igneous basement from Northern High for petrographic, geochemical, isotopic, radiometric dating, and paleolatitude investigation.
• Determine the origin and emplacement history of late Shatsky Rise basement rocks.
Drilling,
coring, and
downhole
measurement
program:
Hole A
• RCB wash to ~50 m above basement, core to TD or bit failure.
• Wireline log (triple combo, FMS-Sonic)
Anticipated
lithology:
• 0–54 mbsf: pelagic ooze
• 54–194 mbsf: chalk and chert
• >194 mbsf: basalt