Proposed Site SRSH-2A

Priority:
Alternate site
Position:
30°49.176’N, 156°21.883’E
Water depth
(m):
4743
Target drilling
depth (mbsf):
397 (297 m sediment, 100 m basement)
Requested
maximum
penetration
(mbsf):
~600 (300 m basement)
Survey
coverage:
Cruise TN037, R/V Thomas Thompson
• Seismic Line 17D (time: 0115Z, 29 Aug 1994) (Fig. AF12)
• Track map (Figs. AF13, AF14)
Objective:
(see text
for details)
• Core igneous basement rocks from the deep flank of Southern High for petrographic, geochemical, isotopic, radiometric dating, and paleolatitude investigation.
• Determine the origin and emplacement history of early Shatsky Rise basement rocks.
Drilling,
coring, and
downhole
measurement
program:
Hole A
• RCB wash to ~50 m above basement, core to TD or bit failure
• Wireline log (triple combo, FMS-Sonic)
Anticipated
lithology:
• 0–41 mbsf: pelagic ooze
• 41–200 mbsf: chert/chalk
• 200–297 mbsf: shaley chalk, limestone, and chert
• >297 mbsf: basalt