Priority:
|
Primary
|
Position:
|
40°14.00′N, 47°30.00′W
|
Water depth (mbrf):
|
4150
|
Target drilling depth (mbsf):
|
400
|
Approved maximum penetration (mbsf):
|
Request 900; pending EPSP approval
|
Survey coverage:
|
•Primary line: KNR 179-1, Line 46, SP 218 2155
•Crossing line: MCS Line RC2510 11B, SP 1600Z 3073
|
Objective:
|
Lower Oligocene and upper Eocene with record of E/O boundary; biotic changes around the E/O and late Eocene; late Eocene impact horizons; transition to different type of drift sedimentation and associated changes in flow characteristics of the Deep Western Boundary Current; CCD evolution; middle of depth transect.
|
Coring program:
|
•Hole A: APC/XCB to 300 mbsf with orientation and APCT-3
•Hole B: APC/XCB to 300 mbsf
•Hole C: APC/XCB to 300 mbsf
•See “Drilling strategy” and Tables T1, T2
|
Wireline logging program:
|
•Hole C: Wireline logging with triple combo and FMS-sonic
•See “Downhole measurements strategy” and Tables T1, T2
|
Anticipated lithology:
|
Carbonate ooze, hemipelagic clay, shallow-water carbonates
|