Priority:
|
Primary
|
Position:
|
08°0.4200′N, 087°10.9020′E
|
Water depth (m):
|
3685
|
Target drilling depth (mbsf):
|
300
|
Approved maximum penetration (mbsf):
|
500
|
Survey coverage (track map; seismic profile):
|
• Map (Fig. AF1)
• Seismic Line GeoB97-20+27, CMP 10760 (Fig. AF8)
• Seismic Line GeoB06-247, CMP 832 (Fig. AF9)
|
Objective(s):
|
Depocenter migration
|
Drilling program:
|
Hole A: APC/XCB to 300 m
|
Logging program and downhole measurements program:
|
APC core orientation and formation temperature measurements (APCT-3)
|
Nature of rock anticipated:
|
Mud turbidites
|