PEAT-5 Line 6:
|
2006 JD 090 11:07:48 UTC, SP 42593
|
Nearest crossing:
|
PEAT-5C Line 1 at 2006 JD 090 03:27:49 UTC, SP 39833 and Line 6 at JD 090 11:36:58 UTC, SP 42768
|
Estimated crustal age (Ma):
|
31–32
|
Ship location:
|
SP 42593: 7°42.062’N, 128°15.188’W
|
Basement depth (m):
|
4564 (6.064 s TWT)
|
Sediment thickness (m):
|
252 (estimated) (0.316 s TWT)
|
Velocity (Mayer et al., 1985):
|
|
|
|
|
|
|
|
|
|
|
Site PEAT-5C was chosen on a hill west of the intersection of Lines 6 and 1 because the lower section was better imaged and the basement was distinct and because the additional thickness at the cross of Lines 1 and 6 was primarily caused by Miocene sediment on top and not by the section of primary interest below. Subbottom profiler sections image ~60 m of layered sediments in the upper sediment column.
|